# How Do I Write an Estimate in Xactimate?

> **Canonical URL:** https://restorationintel.com/how-do-i-write-an-estimate-in-xactimate/
> **Post ID:** 1060 | **Published by:** Restoration Intel (restorationintel.com) | **Synced:** 2026-11-24

---

*Updated November 24, 2026 — refreshed with verified 2-page PDF field brief, bespoke workflow diagram, and primary standards references.*

**Direct Answer:** Xactimate's core estimating workflow follows four sequential stages: Claim Info, Sketch, Estimate Items, and Complete. Building accurate Sketch dimensions first locks wall, ceiling, and perimeter calculations, while matching exact Verisk selector codes with photo-backed F9 notes prevents adjuster line-item cuts.

U1-1060 · ESTIMATING & XACTIMATE

Field Brief & Checklist: How Do I Write an Estimate in Xactimate?

Download the 2-page Print-First PDF brief or pull the companion `.md` twin for **Estimating & Carrier Pricing**.

[Download Field Brief (PDF)](https://restorationintel.com/wp-content/uploads/2026/11/ri-how-do-i-write-an-estimate-in-xactimate.pdf)[Markdown Twin (.md)](https://restorationintel.com/how-do-i-write-an-estimate-in-xactimate.md)

**The short answer:** Xactimate's own training teaches estimate writing as four steps, in this order: **Claim Info, Sketch, Estimate Items, Complete.** Everything else — the menus, the shortcuts, the tricks — hangs off those four. If you understand what each step is for, the software stops feeling like a maze.

This page walks through all four in plain language, pulled straight from Xactware's official documentation and training materials. No shortcuts presented as gospel, no "trust me" — just what the maker of the software says the process is, translated out of manual-speak.

## Step 1: Claim Info — set up the job before you touch a line item

Before you draw anything or price anything, Xactimate wants the facts of the claim nailed down. In the desktop version you start from the Control Center / Local Projects page and create a new project; in [Xactimate Online](https://restorationintel.com/xactimate-online-vs-desktop/) it's the **+ New Project** button on the Projects page.

Either way, you're asked for the same foundation:

- **Who:** client name and contact info
- **Where:** property address
- **Which claim:** the claim number
- **What happened:** loss type and date of loss
- **The money details:** policy information, the tax jurisdiction for the job

You also pick two things that quietly control everything downstream:

1. **Your profile** — this is whose settings, templates, and defaults the estimate runs under. Pick the wrong profile and you're fighting defaults the whole job.
2. **The price list** — Xactware publishes [regional price lists updated every month](https://restorationintel.com/xactimate-scope-development-how-carriers-price-restoration-claims/), built from what contractors in the field report they're actually charging. Pick the price list that matches the project's location. An estimate priced on the wrong region's list is wrong before you've written a single line item.

Xactimate Online also asks you to choose a project type at this point: a standard **Estimate**, a **FEMA Flood** project (settings pre-adjusted for NFIP flood claims), or **360Value** (a replacement-cost valuation insurers use for underwriting, not a repair estimate). Most restoration work is the standard Estimate type.

**Why this step matters:** everything downstream — the sketch quantities, the line-item pricing, the tax math — keys off what you enter here. Garbage in at Claim Info means rework everywhere else.

## Step 2: Sketch — draw the rooms, because the drawing does the math

The Sketch is Xactimate's floor-plan drawing tool, and it's the step beginners most want to skip. Don't.

You draw each affected room or area — walls, doors, openings, ceiling heights. The sketch isn't decoration. It's what generates your quantities: square footage of drywall, linear feet of baseboard, square footage of flooring. When you place line items in the next step, they pull quantities from the sketch.

The sketch window has four parts: the tools (what you draw with), search, the sketch workspace itself, and the items panel. You can view the sketch in 3D to check your work, and there are tools like Missing Wall for openings and staircases.

**The plain-English version:** measure twice, draw once. An accurate sketch means your quantities are defensible. A sloppy sketch means every line item downstream is built on sand — and that's exactly the kind of thing an adjuster questions first.

## Step 3: Estimate Items — the actual line items

This is the step people mean when they say "writing the estimate." With Claim Info set and the sketch drawn, you add line items — the individual units of work, each with a code, a description, a quantity, and a unit price from the price list.

A few things worth knowing about how the pricing works, straight from Xactware's training:

- **Unit prices come from the field.** Xactware surveys contractors on what they charge. The published unit price for a line item includes the costs and fees of performing that task — but it does **not** include general overhead and profit. O&P gets applied separately, which is why it shows up as its own line and its own argument.
- **Price lists update monthly.** If your list is stale, your numbers are stale. This is one of the most common silent errors in estimates that get questioned.
- **Line items carry more than price.** Each item has a coverage assignment (Dwelling, Other Structures, Contents — the three coverage types in the Coverage/Loss section), and you can apply the deductible across all coverages or to specific ones.

You add items by searching the price list database, setting quantities (which can pull from your sketch), and adjusting as needed. Notes and photos attach at the line-item level — and this is [where estimates live or die in review](https://restorationintel.com/which-xactimate-line-items-adjusters-approve/). An item with a photo and a note explaining *why* it's there survives. An identical item with no documentation gets stripped.

## Step 4: Complete — review it like the adjuster will

The last step is review and output: check the estimate summary, verify totals, and generate the reports. Xactimate's Estimate Reports window lets you choose which report to print and set options for each — the standard estimate report, summaries by category or coverage, and so on. You can export to PDF.

**Read your own estimate before anyone else does.** Check that the price list is current, the tax jurisdiction is right, quantities trace back to the sketch, and [every unusual item has a note or photo](https://restorationintel.com/documentation-gets-supplement-approved/). That's the entire quality-control pass, and it takes ten minutes.

## The three things that trip up new estimators

These aren't in any manual's troubleshooting section, but they account for most of the pain:

1. **Wrong price list.** Monthly updates, regional lists. If you opened an old project as a template and never updated the list, your pricing is fiction.
2. **Sketch first, items second.** Items placed without a sketch have hand-typed quantities nobody can verify. Adjusters know this.
3. **Undocumented items get cut.** The line item isn't the argument — the photo and the note are. This matches what we wrote about [undocumented mitigation getting stripped from estimates](https://restorationintel.com/undocumented-water-mitigation-gets-stripped-from-estimates).

## Where this comes from

- Xactware's official help documentation: "Create and import projects in Xactimate online" (xactware.helpdocs.io) — project setup, project types, profiles.
- Xactimate's training curriculum (Level 1): the 4-step estimating process — Claim Info, Sketch, Estimate Items, Complete — plus price-list mechanics (monthly updates, field-surveyed unit prices inclusive of task costs, exclusive of O&P) and coverage types.
- Related reading on Restoration Intel: [Your Xactimate Scope Is Lying to You About Profit](https://restorationintel.com/xactimate-scope-profitability-dashboard-job-close) · [Xactimate and Scope Development: How Insurance Carriers Price Restoration Claims](https://restorationintel.com/xactimate-scope-development-how-carriers-price-restoration-c) · [RIA Pushes Xactimate for Dedicated Material-Handling Line Items](https://restorationintel.com/ria-xactimate-material-handling-line-items)

*This is a translator's guide, not the manual. When in doubt, Xactware's own documentation is the authority — this page just tells you which parts of it matter and why.*

## How Do I Write an Estimate in Xactimate? — Visual Workflow

Field Reference Architecture — Estimating & Carrier Pricing

## Field Benchmark & Decision Matrix

| Xactimate Stage | Mandatory Field Input | Calculation / QA Rule | Carrier Reviewer Trigger |
| :--- | :--- | :--- | :--- |
| 1. Claim Info & Profile | ZIP-matched price list + coverage tier | Match DOL month/carrier profile settings | Wrong price list date or tax rate triggers reject |
| 2. Sketch Modeling | Room L/W/H, doorways, tray ceilings | Auto-calc SF/LF variables (WC, F, PF) | Manual quantity guesses fail desk audit |
| 3. Selector + Activity | Exact CAT/SEL code & remove vs. R&R | Audit Includes text inside green line info | Double-billing Tear-Out + Remove holds pay |
| 4. F9 Scope Justification | Standard/code citation + moisture ref | Attach clear F9 note per non-base line | Bare line items without photos get cut |
| 5. Complete & ESX Export | Photo deck labeled room-by-room | Inspect summary, recap by room & O&P | Unorganized dumps delay supplement check |

## Practitioner Operational Takeaways

- Inspect the green Line Item Information ("Includes / Excludes") panel inside every Xactimate selector before adding standalone haul or prep charges.
- Never hand-override Sketch variables without documenting doorway openings, vaulted ceilings, or containment barriers on the floorplan.
- Write specific F9 notes referencing S500/S520/S700 sections and labeled photo numbers on specialty equipment or detachment lines.
- Split emergency mitigation estimates cleanly from reconstruction scopes so carrier payment on drying never waits on finish selections.

## Standards & Primary References

- [Markdown Twin (.md)](https://restorationintel.com/how-do-i-write-an-estimate-in-xactimate.md)
- [Verisk Xactimate Estimating Platform](https://www.verisk.com/products/xactimate/)
- [Xactimate vs. Symbility Shop Comparison (RI #1077)](https://restorationintel.com/xactimate-vs-symbility/)
- [Xactimate Material-Handling Line Item Guide (RI #1922)](https://restorationintel.com/xactimate-material-handling-line-item-how-to-use/)

## Frequently Asked Questions

### What are the four main workflow tabs in Xactimate?

Xactimate organizes every estimate into Claim Info (loss metadata and price list), Sketch (room dimensions and variables), Estimate Items (line-item scoping and F9 notes), and Complete (QA inspection and export).

### Why do adjusters cut line items that lack F9 notes?

Desk reviewers cannot tell whether an extra clean, containment wall, or detach/reset line was required by field conditions unless the F9 note pairs a standard rule with timestamped photos.

### Should restoration contractors separate mitigation and reconstruction estimates?

Yes; keeping mitigation drying logs separate from reconstruction put-back speeds up initial emergency cash flow and matches how most carrier claims departments split desks.

U1-1060 · ESTIMATING & XACTIMATE

Save Field Brief: How Do I Write an Estimate in Xactimate?

Print-First 2-page PDF brief + machine-readable `.md` twin for carrier and field review.

[Download Field Brief (PDF)](https://restorationintel.com/wp-content/uploads/2026/11/ri-how-do-i-write-an-estimate-in-xactimate.pdf)[Markdown Twin (.md)](https://restorationintel.com/how-do-i-write-an-estimate-in-xactimate.md)
