One storm makes six different jobs. Scope the one that actually hit.
Treefall is not pull-off. Pull-off of the covering is not loss of the structure. And the 25 percent rule has an exception — Fla. Stat. §553.844(5) — that most scopes miss entirely, in both directions: post-2007 roofs written as automatic full replacements overstate the job, and pre-exception roofs written as patches understate it. The Storm Scope Kit is the field system Restoration Intel’s storm desk uses: scope by job type, file the code-edition evidence, stamp the clocks.
Who it’s for
Owners, GMs, and estimators who run storm response — Florida shops first (the code and statute material is Florida’s, and the card says so), any shop that wants the decision structure for its own state’s rules.
Start free — the Storm Scope Field Card
“Scope the Storm That Actually Hit” on one printable field card: the six job types, the 25 percent rule and its exception, the water line, and the claims clocks. Free, one button, no email required.
Download the free field card (PDF)
$7 — The Storm Scope Files
The self-serve field files, spun from “Scope the Storm That Actually Hit”:
- The 25 Percent Rule section-math worksheet — total area vs. section area, tie-off excluded, 12-month lookback counted
- Treefall and pull-off scope sheets — covering vs. structure kept separate, the §707.3.2 thirty-percent diaphragm test on the sheet where it belongs
- The code-edition evidence log — permit history and prior replacement records filed next to the section math
- The water-line evidence log — gauge, elevation, entry path, wind-opening vs. ground-up
- The claims-clock stamp sheet — date of loss plus the three deadlines (FL new claim 1 year, supplement 18 months, NFIP proof of loss 60 days), filled in per job
$47 — The First 72 Hours Kit
Everything in the Files, plus the GM’s decision system from “The GM in a Storm Event: Your First 72 Hours”:
- Stand-or-hold decision card — verified damage vs. forecast, one board owner, the three-column board (live / watch-and-hold / no)
- Call-in order sheet — leads, cross-trained techs, call logging, estimators, in that order
- Intake script + filter — loss type, active water, power, area, building type, who can authorize, carrier/TPA on file — take, prioritize, or decline early
- Exposure-ceiling worksheet — materials, rentals, and vendor commits capped against authorized, documented work
- Communication cadence templates — customer update, adjuster update, commercial-door change orders, on a locked rhythm
- Rotation and stop-rule sheet — stretch rules named before exhaustion negotiates them
Get the First 72 Hours Kit — $47
$97 — The Full Storm File
Everything above, plus the paperwork that decides payment, from “After Isaias: The Claims Clock, the Wind/Flood Split” and RI’s emergency services agreement guide:
- The wind/flood split documentation pack — cause kept unblended across photos, moisture map, and narrative; the field questions on every job (where did water enter, at what elevation, through what opening)
- The week-two customer script — say this / don’t say this, calendar-true, including the NFIP warning
- Emergency services agreement provision checklist — the eight provisions RI’s agreement guide walks through, checked before the season, not during it
- Mutual-aid terms one-pager — what they send, who supervises, who owns the customer and the file, how materials bill, when they go home
The honest notes
- The 25 percent rule, the §553.844(5) exception, and the claims clocks on these sheets are Florida’s, quoted from the 2023 Florida Building Code (Existing Building §§706.1.1, 707.3.2) and Fla. Stat. §§627.70132, 627.4025, 627.701 as Restoration Intel’s storm coverage documents them. Verify your own state’s rules before scoping to them.
- Checklists and templates, not legal advice.
