Which Xactimate Line Items Do Adjusters Actually Approve?

The short answer: there is no published “approved list.” Adjusters approve line items that are (1) the correct item for the work described, (2) backed by documentation, and (3) quantified in a way someone else can verify. Items get cut for the opposite reasons: wrong item for the work, no photo or note explaining why it’s there, or quantities nobody can trace. The item itself matters less than the case you build around it.


What a line item actually is

Every Xactimate line item has the same anatomy: a code, a description of the task or material, a unit of measure (square foot, linear foot, each, hour), a quantity, and a unit cost from the regional price list. Total cost is quantity times unit cost. That’s the whole structure — everything else is judgment about which item fits the work.

Line items live in categories: demolition and debris removal, structural repairs, drywall, flooring, paint, electrical, plumbing, HVAC, contents, and more. The price-list database is large, which is both the power and the trap: there’s usually a right item, a close-but-wrong item, and three items that sound similar but price differently.

Why items get stripped: the three usual reasons

1. Wrong item for the work. The most common error. An estimator grabs an item whose description is close to the work but not quite it — wrong unit of measure, wrong material, wrong application. On review, the adjuster reads the description, compares it to the photos, and cuts it. The fix is unglamorous: read the full item description before placing it, every time. Estimator guides call this the number-one avoidable dispute, and they’re right.

2. No documentation. The item might be perfectly correct, but there’s no photo showing the condition and no note explaining why the work was necessary. From the reviewer’s side, an undocumented item is indistinguishable from padding. This is the same principle behind our piece on undocumented mitigation getting stripped — the photo and the note are the argument; the line item is just where the argument lives.

3. Quantities nobody can verify. Items placed without a sketch behind them carry hand-typed quantities. Maybe they’re right. Nobody reviewing can tell. Quantities that trace to the sketch are defensible; quantities that don’t are negotiable, and negotiation favors whoever’s holding the checkbook.

There’s a fourth, subtler one: labor/material double-counting. Some line items bundle labor and materials; others cover only one. Placing a labor-only item next to a bundled item for the same work double-counts. Reviewers catch this fast.

The live case study: material handling

In September 2026, the Restoration Industry Association formally asked Verisk’s Xactware pricing team to add dedicated line items for material handling to the Xactimate database. RIA’s argument: procuring and managing materials has become a major operational cost for contractors — sourcing under current market conditions takes real labor — and there’s no clean line item for it.

This is the perfect illustration of the whole page. When the database has no dedicated item for real work being performed, contractors improvise — burying the cost in other items, writing vague descriptions, or leaving it out and eating the cost. Improvised items get questioned. Dedicated items with clear descriptions get approved. RIA is trying to move material handling from the first category to the second, through the official channel, with operational data to back it up. That’s how the system is supposed to work.

From the field: the software sometimes mislabels things itself

An adjuster on the CatAdjuster forum — adjusters talking to adjusters — described fighting Xactimate over a cemented-down fountain: the software classified the fountain line item as contents rather than building property, splitting it into a different part of the estimate with no way to reclassify it. The fix involved overwriting the description on a different line item entirely.

The lesson isn’t that the software is broken. It’s that line-item classification has consequences — contents vs. building property changes coverage, depreciation treatment, and which part of the estimate the item lands in. When an item lands somewhere surprising, check its classification before assuming the reviewer will figure it out. They won’t; they’ll question it.

The practical checklist

Before you submit, run each unusual item through this:

  1. Description match. Does the item description actually describe the work in the photos? Not close — actual.
  2. Unit sanity. Is the unit of measure right for how the work was performed?
  3. Labor vs. material. Does this item bundle both, or do you need the companion item? Are you double-counting?
  4. Classification. Building property or contents? Right coverage bucket?
  5. Documentation. Photo showing the condition, note explaining why. Every time.
  6. Quantity trace. Can someone follow this number back to the sketch?

Items that pass all six rarely get cut. Items that fail two or more almost always do.


Where this comes from

  • From Xactimate (official): line-item anatomy (code, description, unit, quantity, unit cost) and the price-list database structure, per Xactware’s documentation and training materials.
  • Industry record: RIA’s September 2026 formal request to Verisk/Xactware for dedicated material-handling line items (reported by R&R Magazine and Cleanfax; RIA CEO Saima Hedrick quoted on the record).
  • From the field (labeled): the fountain-classification anecdote comes from an adjuster’s post on the CatAdjuster forum — one adjuster’s experience, not a universal rule. The “read the description” and documentation guidance reflects widely published estimator best-practice guides (third-party, not Xactware-official).
  • Related on Restoration Intel: How Do I Write an Estimate in Xactimate? · RIA Pushes Xactimate for Dedicated Material-Handling Line Items · Undocumented Water Mitigation Gets Stripped From Estimates

No list of “approved items” exists because approval isn’t about the item — it’s about the case. Build the case and the item survives.

Scroll to Top